Systemic Trial-Monitoring Programmes
The closing phase in project management is probably the most neglected on both the theoretical and practical levels. Closing down operations can refer to completing a specific phase of a programme’s operations or to closing the programme as a whole. Bringing an entire programme to an
end involves intense efforts to ensure that all aspects of its work and its administrative components
are completed. Closing a phase of a programme is less demanding, since it is smaller in scale and
staff members and structures remain in place to assist with any loose ends that the programme may
have left unaddressed.
The point at which a systemic trial-monitoring programme wraps up its operations, or some aspects
of its operations, will depend on multiple factors. These can be political, financial or substantive.
Political considerations can be complex. In some cases, they can result in an OSCE field operation
no longer having a mandate to carry out certain operations, or being closed entirely. Financial considerations pertain to the availability of continued funding for a trial-monitoring programme. Considerations of substance might be that the monitoring programme has successfully completed its
overall goal or more specific objectives.
This chapter first outlines sustainability issues to consider when bringing a programme to an end,
and then describes other considerations that should be taken into account as a programme is ending.
14.1 Activities to support the sustainability of monitoring work
Systemic trial-monitoring programmes often promote judicial reforms by providing a review or
oversight function that may be absent in justice systems in transition. Ideally, a country’s own institutions and citizens should be able to take on this oversight role independently when an international programme comes to an end. If this is not the case, a sudden closure of operations could have
negative effects on the justice system and lead to the unravelling of programme achievements. In
order to avoid leaving a vacuum behind, long before a programme shuts down, programme managers should consider how its work can be sustained. Arguably, systemic programmes should aim
from the start at developing local reforms and sufficient local capacity so that an international programme will no longer be needed.
Programme managers examining the sustainability of trial-monitoring programmes should identify which domestic institutions or organizations might be in a position to provide adequate review or
oversight when the programme closes. In developed democracies, many checks and balances exist
to prevent abuses or to right the wrongs in a legal system. Mechanisms within the system include:
adversarial proceedings, in which all parties are bound by codes of ethics; effective disciplinary procedures for all judicial actors; higher courts that review the merits and legality of lower court decisions; national human rights institutions, including ombudspersons; and supranational courts or
bodies, before which individuals can bring their grievances. Examples of review mechanisms outside the justice system are: media that can expose deficiencies and be watchdogs on behalf of the
public; academics or other jurists and think tanks who comment professionally on judicial decisions
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents