Recommendations
(E/CN.4/2006/6/Add.3)
Severe overcrowding; very poor
conditions.
Steps taken in previous years
(See: A/HRC/4/33/Add.2 and
A/HRC/7/3/Add.2)
•
•
Financial resources allocated have
drastically increased and
considerable refurbishment
programmes are underway, funded
from the State budget
Some prison facilities underwent
substantial reconstruction (Rustavi
Prison No. 2); no overcrowding in
Tbilisi Prison No. 7; other works in
several institutions, including
women and juveniles cells; Rustavi
Information received on steps taken since
December 2007/current situation
applied sentences for the last five years
• In 2007 and 2008 Penal Reform
International, with support from the
European Union, together with the
Probation Service, held a number of
meetings to discuss a new probation law;
these meetings showed that probation is
widely misunderstood, and that chronic
under-resourcing has had the effect of
discrediting this institution in the eyes of
the police, courts and prosecutors. It is
for this reason that constructive
alternatives to imprisonment are
underused; limited pilots in two locations
have started in cooperation with
international organizations and the
government, including risk and needs
assessment/sentence planning tools and
provision of qualified social work teams
serving juvenile probationers
Government 2008: The official capacity of
the prisons as of 26 January 2009 has been
determined by Decree No. 24 of the Minister
of Justice of Georgia (see appendix 2,
table 1).
• The following penitentiary institutions
have been constructed and renovated in
2008:
• In March, renovation works on
buildings were completed in Geguti
No. 8 institution. As a result, the
A/HRC/10/44/Add.5
page 33
Confinement in
detention not exceed
the official capacity (l);
Existing institutions be
refurbished to meet
basic minimum
standards (m); and New
remand centres be built
with sufficient
accommodation for the
anticipated population
Situation during visit
(See: E/CN.4/2006/6/Add.3)