on affirmation of the “Internal Disciplinary Rules in the Penitentiary
Institutions”, the “Internal Disciplinary Rules in the Investigation Isolators”
and “Internal Disciplinary Rules in the Temporary Detention Places” were
affirmed.
On the paragraphs 14 – 19 (Undertaking by the Ministry of Justice of
measures in the direction of elimination of density occurred in some of the
penitentiary institutions; accelerating of constructional works in newly built
penitentiary institutions):
In order to bring the detention conditions in the penitentiary institutions
in conformity with the international standards, as well as exclusion of
density cases, the attention was paid to construction of new penitentiary
institutions in the regions of the republic.
The construction of the Sheki Penitentiary Complex was finished in
2013 and it was put into exploitation with participation of the Ombudsman
on July 2013, and started functioning at the end of the year. The
constructional works in compliance with project – estimate documents are
continued within the frames of means annually allocated by the state in the
penitentiary institution and Correctional institution in Zabrat settlement of
Baku city, in the prison in Umbaki settlement, in the under construction
penitentiaries in Ganja and Lenkoran. The building of new Medical
Institution is also included to the complex of new penitentiary institutions to
be constructed in Baku city. Creation of necessary conditions in new
Medical Institution was considered. Preparation of project – estimate
documents on mixed-type penitentiary institution to be constructed in
Kurdamir in approval with concerning organizations was finished.
Depending on allocation of financial means realization constructional works
are consecutively continued.
On the paragraph 20 (Provision of the medical-sanitarian unit of the
Penitentiary Institution No. 5 with new building by the Ministry of Justice):
Taking into consideration that the building of the Medical – Sanitarian
Unit is old and its reconstruction is impossible, the relevant project
documents were prepared for construction of a new one, the matter was
raised before the Ministry of Economy and Industry in 2013 and 2014 years
for allocation of financial means from the State Investment Expenses of the
State Budget, but this was not achieved. Despite this, project proposals were
submitted to relevant bodies for allocation of investments for the
construction of medical-sanitarian unit meeting the modern standards in
2015.
Alongside with this, repairing works were carried out in the treatment
wards of the MSU in the beginning of 2014 and 3 wards consisting of 16
beds have been completely repaired. The electric lines were renewed,
sanitarian unit and bath for the inmates were re-constructed, the walls and
62