Annual Report 2012: Spain’s National Preventive Mechanism
Clinical records must be
computerized and
connected with the general
healthcare network, and
guarantee the
confidentiality of the
information
The functions of the
professionals rendering
services in the center must
be defined
Excess rotation of
personnel must be avoided
The center’s layout is
reminiscent of a small
village
202. The center that was inspected does not have computerized clinical records
or connection to the general healthcare network. In consequence, information
regarding health care issues of some patients or their current diagnosis and treat
ment has to be found by searching through paper files, some of which are very
old. The center also lacks a common database and systems to guarantee the con
fidentiality of the data. Each building operates with its own data processing sys
tem, and some discrepancies were observed between these data and the ones pro
vided by the Department of Social Work. In consequence, appropriate measures
must be adopted to mitigate these deficiencies.
203. The workers at «San José» Residence are subject to the «Framework Agree
ment for Clinical Personnel» (acuerdo marco de personal clínico), also applicable
to the Toledo Provincial Hospital, which refers mainly to hospital functions and
is thus not suitable for the center, where many tasks that are essential in caring for
the residents are not included. The center needs to establish an internal organiza
tional system with the job descriptions of the professionals who work there.
204. Staff substitutions are handled by means of the so-called one-day «urgent
substitution contract» that are managed by the center itself of which there were
about 400 every month. Even though the number of these contracts is diminish
ing, as noted, it is necessary to adopt necessary measures to avoid an excessive
level of staff rotation and its repercussion on care of the residents.
205. The «San José» Residence was built in the decade of the sixties, with a struc
ture that is reminiscent of a small village. In the middle of the complex there is a
square with a kiosk, reading room, hairdressers, cafeteria and game room, al
though during the inspection visit the team only saw the cafeteria in operation.
The game room is closed, and has dampness and paint peeling from the ceiling.
There is also a church, with daily mass, a swimming pool and outdoor area with
some fitness equipment for elderly persons. This equipment is not properly se
cured to the ground, and is thus not used.
«Square» with the center’s
Photograph 56
facilities and services
148
THE OMBUDSMAN OF SPAIN
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents