seen anywhere during the inspection. All rooms had their windows wide open as this was the
only way to ventilate the rooms. The children’s rooms still had no heating at all although the
inspection was conducted in the winter heating season. The children wore warm overcoats at all
times.
There is only one common sanitary facility on the floor. It has two squat toilets and one sink.
There were video surveillance cameras installed only in the corridors, but there were no outdoor
security arrangements. Sections of the yard fence were missing. The school’s Internal Rules and
Regulations were not posted in a conspicuous place.
The physical environment and property were generally in a poor state of repair. Only the doors
and window frames had been replaced.
3.2. Education and Training
The CBS in the village of Kereka provides educational service to its inmates from grade 5
through grade 8. The school formed composite classes with pupils from grades 5 and 6. The
inspection team attended a woodworking practice session. The team was left with the
impression that despite the considerable efforts made by the teacher, the children were not
particularly interested or involved in what they were being taught. This was corroborated in
interviews with the children. They shared with the team that they were not at all interested but
attended the class because they had no choice. The time of the inspection coincided with class
time and the children were in the classrooms. It was notable that, whilst the children had been
provided with learning aids and exercise notebooks, those had not been used. The classroom
equipment was outdated and worn out, and did not meet the requirements of modern-day
education. The woodworking practice shop is at a distance from the main building and has no
heat. Moreover, it was quite dirty and dusty. The team did not receive convincing explanations as
to how health and safety was monitored and maintained in woodworking practice sessions,
given that there were no woodworking tools and supplies stored in the shop besides the
woodworking machines and some lumber. This called into question the assertions made by the
principal that the woodworking shop was regularly used. And even if it was routinely used, the
issue of ensuring the safe use of woodworking machinery still remains open.
The conclusion drawn by the NPM was that education-related classroom activities were hardly a
priority, either for the children or for their teachers. None of the children interviewed expressed
any attitude towards the education process.
The children raised also the problem relating to the use of the computer room. They shared that
their computers were old and had no access to the internet.
3.3. Medical Care
The boarding school has no health room. All inmate students were registered with a GP practice
and were also on a dentist’s patient list. In the current academic year, one of the boys had been
diagnosed with paranoid schizophrenia. On the initiative of the principal, the student had been
released from the boarding school in a timely fashion on medical grounds. Also in the current
academic year all students had been given a tuberculin test and three boys had tested positive.
One student had been diagnosed with bronchial asthma and another one had a varicocele.
There were students with mental illness, the principal diagnosis being mild mental retardation.
Their schooling was supported by a special education resource teacher.
57
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents