We also proposed that PS Slovenske Konjice provide additional pillows for overnight detention. The MNZ replied that the station had already submitted a request for the purchase of two pillows to the relevant service. We proposed that PS Šentjernej examine possibilities for the systematisation of a workplace for a duty officer so that the detention room at this station could also be used. The MNZ replied that our proposal had been examined; however, the increased systematisation of a workplace for a duty officer had not been possible at that time. We proposed that PS Škofja Loka examine the possibility of installing a wash basin with running water also in room 1 for shorter detention during the renovation works. The MNZ replied that the proposal would be examined, but the installation of a wash basin depended on the renovation of detention rooms, which was not anticipated. We further proposed that PS Škofja Loka paint the walls in rooms marked Govorilnica and Razgovori. The MNZ replied that the discussions with the relevant service regarding the painting were underway. We also suggested that PS Škofja Loka examine the possibility of installing switches for artificial light regulation in both detention rooms. The MNZ responded that our proposal would be examined. We proposed to PS Tolmin that walls at the station from which plaster is falling off be renovated accordingly. The MNZ responded that the renovation would take place during regular maintenance. The funds for renovation were obtained from Nova Gorica Police Directorate, and a low-value contract for rehabilitating the premises was underway. We proposed that PS Trebnje ensure additional (spare) blankets. The MNZ replied that the station had already asked the competent service for the allocation of additional blankets. We proposed that PS Tržič suitably affix the water tap in room 1 for shorter detention. The MNZ replied that the water tap would be affixed accordingly. We proposed that PS Vrhnika repair the flush button in the toilet of the detention room so that it does not have to be held down during flushing. The MNZ replied that renovation works had been implemented at the station and the flush button had also been repaired. 116 IMPLEMENTATION OF THE DUTIES AND POWERS OF THE NPM IN 2016 NATIONAL PREVENTIVE MECHANISM UNDER THE OPTIONAL PROTOCOL TO THE UN CONVENTION AGAINST TORTURE AND OTHER CRUEL, INHUMAN OR DEGRADING TREATMENT OR PUNISHMENT

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents