Retirement and nursing homes
health and care into consideration (see Austrian Court of Audit, Bund series
2020/8).
Many recommendations by the NPM were implemented in the retirement and
nursing homes in 2020 too.
Many recommendations
implemented
A nursing home in Vienna expanded its activities programme, which is now
organised and implemented by social care experts. Concepts for violence
prevention and dealing with dementia were also introduced as well as a late
shift for the purpose of allowing residents to go to bed later.
Commission 1 was able to identify considerable improvement in a home in
Tyrol since their last visit. Medication is now “packaged” by qualified care staff
only. Measures for preventing falls were introduced and were effective. The
evening meal was served later on a trial basis in a home in Styria. Additional
staff were deployed on the late shift, in particular due to the large number of
residents suffering from dementia.
In accordance with a recommendation by Commission 6, team and individual
supervision are actively offered and availed of in a home in Burgenland. A
home in Upper Austria acted on a recommendation from Commission 2. Staff
satisfaction is now evaluated regularly. Mental stress is recorded and analysed
every year with the support of an occupational psychologist.
As in previous years, homes frequently performed evaluations of medicationbased measures that restrict freedom and reporting of the same to the residents’
representatives as a consequence of visits by the commissions.
Structural modifications and changes in design were implemented in some
homes. Complaint letter boxes were mounted or placed in a better location,
lighting systems adjusted to better illuminate the corridor area, automatic
door openers installed, acoustic announcements activated or improved in lifts,
and ramps ordered for balconies.
If the statements of opinion by the owners and operators or the supervisory
authority fail to clearly indicate that sufficient action has been taken on
the criticism by the NPM and recommendations implemented, follow-up
visits ensue. The procedure is the same if commissions have the impression
that one monitoring visit will not suffice to cover more complex issues. This
was the case, for example, in a private home in Vienna. The NPM received
credible accounts of possible assaults on residents by employees. These could
not be verified; however, the commission had the impression after talking to
residents that the conduct of the employees was not appropriate. In particular,
the behaviour of one qualified nurse was described by several residents as
unpleasant, unprofessional and disrespectful. Structural violence was evident
on fixed shower days. The call bells for some residents with very restricted
mobility were placed too high and they were thus unable to reach them,
as observed during the visit. All of the residents confined to their bed wore
Indications of structural
violence always result in
a follow-up visit
26
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents