While the examining the medical room, some of the medicines were
exposed in the wardrobe where the medicines were stored and the
immediate removal was provided by the hospital.
According to the result of the visit the need for capital repair of the
premises of the enterprise, provision with a qualified medical worker,
increasing the control over the use of expired medicines were defined.
At the end of the visit, basing on national legislation and the Convention
of the Rights of the Child, the NPG members recommended to the
administration of the school to carry out teaching of child rights, to keep
under control the situation with treatment of children by the staff.
The visit was held by the NPG members under the demand of OPCAT to
the Integration Training Gymnasium of Boarding Type of Mingachevir.
The aim of the visit was to assess treatment conditions, children's
nutrition and the supply of medicines, medical care, heating supplies.
During the visit, the canteen, food store, other rooms and relevant
documents were examined. Relevant conversations were made with the
children living in the institution, their rights were explained. During the
visit, the necessity of repair of the Gymnasium building was observed.
There is a need to bring the enterprise to new, up-to-date standards. The
administration of the enterprise said that issues related to improving the
conditions of detention and the renovation of the enterprise were raised
before the Ministry of Education.
At the end of the visit, basing on national legislation and the Convention
of the Rights of the Child, the NPG members recommended to the
administration of the school to carry out teaching of child rights, to keep
under control the situation with treatment of children by the staff.
The visit was held by the NPG members under the demand of OPCAT to
the Integration Training Gymnasium of Boarding Type of Balaken.This
facility has been operating since 1966. Gymnasium was renovated in 2016,
taking into account the recommendations of the Commissioner in the
framework of the NPM activities. Currently, 184 children are enrolled here.
80 children stay for night, except Saturdays and Sundays. The dormitory has
120 beds. There are 25 teachers, 31 technicians and 9 tutors in the facility.
The gymnasium is equipped with a heating system. The issue has been
raised before the Ministry of Education for the purpose of resolving
shortcomings in the construction of the school's internal heating
energy.Tête-à-tête meetings were conducted with the children for the
investigation of treatment issues and their rights were explained to them.
At the end of the visit the administration of the institution was given
recommendations basing on national and international standards and with
regard the elimination of the abovementioned shortcomings.
47
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents