The newest IAB TDF building of the country is that of the Ton District IAB TDF that was built in 2009. It is a single floor building on the territory of the IAB and the one that most fully meets the international standards for the detention conditions. Diagram 10. Capital Repairs of IAB TDFs with the Yearly Breakdown. Diagram 11. Cosmetic Repairs of IAB TDFs with the Yearly Breakdown. The research revealed that most of capital and cosmetic repairs of IAB TDFs were made between 2006 and 2011. Within the past five years, 29 IAB TDFs were repaired with most of them repaired in 2011. Overhauls within the same period were performed in 11 IAB TDFs of the country. Starting from the year 2006, some IAB TDFs have been reconstructed and repaired with the support from the OSCE Centre in Bishkek, including the Sokuluk, Karabuura, Kochkor and At-Bashy District IAB TDFs, and Naryn city IAB TDF. A boiler room was built in the Talas Oblast IAD TDF. It was revealed in the course of the monitoring that the location of IAB TDFs is one of the reasons why the international standards for detention conditions fail to be complied with. For instance, 14 (29.8%) out of the 47 TDFs are located in the basement or semi-basement premises of the IAB buildings. For example, the Kara-Suu district IAB TDF is located in the basement of the city IAB building, three meters under ground, resulting in darkness and humidity in TDF premises. The same location in the basement is noted with regard to the Kyzyl-Kiya and Sulukta IAB TDFs, and the Ala-Buka, Toguz-Toruz, Suzak, Chatkal, Batken and Leilek District IAB TDFs. The Sokuluk, Uzgen, and Kara-Kulja District IAB TDFs, as well as the IAB TDFs of the towns of Osh and Naryn are located in semi-basements, too. Diagram 12. Location of IAB TDF Buildings. 23 (48.%) of IAB TDFs are located on the first floor of IAB buildings, and only 10 (21.3%) of TDFs are located in separate buildings. 35

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents