Table № 6. Excerpts from the draft Action Plan to combat torture and other cruel, inhuman or degrading treatment or punishment 37. 39. To develop a system of measures to overcome overcrowding of the TDFs to ensure compliance with established by legislation standards To conduct regular sanitary-epidemiological measures, disinfection of facilities of places of detention and imprisonment To ensure that every detainee has individual bedding items 40. To provide detainees quality hot meals three times 41. To provide to detainees access to health care 42. To provide each detainee personal hygiene items, as well as the opportunity to carry out hygienic procedures alone To continuously improve the conditions of TDFs, PDFs and Colony In PDFs, to create separate cells for pregnant women and lactating women with conditions which meet the relevant standards 38. 43. 44. until the end of the 3rd quarter of 2014 Constantly But, in the final document, approved by the Government of the Kyrgyz Republic, only the issues under paragraphs 37 and 44 were included.  Pretrial detention facilities The National Centre also carried out preventive visits to detention centers of the SCNS of KR in Bishkek City, Osh City, and the PDFs under the SSEP: the PDF No.21 in Bishkek, the PDF No.23 in Karakol City, the PDF No.24 in Naryn City and the PDF No.25 in Osh City. The last visit was undertaken with an in-depth inspection. The technical condition of the buildings of the above mentioned detention facilities are maintained by carrying out cosmetic repairs, but the main problem is that most of the PDFs are located in buildings which were constructed more than 50 years ago. For example, the PDF No.23 in Karakol was built more than 100 years ago, and the PDF No.25 in Osh has a building which was built in the 19th century. National Centre of the Kyrgyz Republic on the Prevention of Torture | 45

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents