Section four Appendices
The role of the Steering Group and its
structure may be developed in the future in
light of our experience.
Membership
To be effective, the Steering Group should
be small but we should also ensure the
Group represents the wider NPM as much
as possible. The selection of Steering Group
members should take into account the
different types of detention visited and the
different jurisdictions in which the members
operate as well as the nature of the bodies
themselves (i.e. lay and professional bodies).
It will be impossible for the Steering Group
members to represent all places of detention
visited, but diversity will be sought. Given
HMI Prisons’ role in coordinating the NPM,
HM Chief Inspector of Prisons will necessarily
be a standing member of the Steering
Group. Consideration should also be given
to whether HMI Prisons or another member
should chair the Group.
Working methods
It is expected that Steering Group members
will be in regular contact with the NPM
Coordinator and that as much work as
possible will be conducted via email and
telephone contact. Meetings of the Steering
Group will also take place twice a year. The
work of the Group will be transparent and
it shall report back to all NPM members on
their discussions and decisions. A secretariat
function for the Steering Group will be
performed by the NPM Coordinator.
It is proposed that volunteers to serve on the
Steering Group are sought and that four people
will be selected by the NPM Coordinator on
the basis of ensuring an equitable spread
among types of detention visited and lay/
professional bodies. There will be one member
each for England, Wales, Scotland and Northern
Ireland. Membership of the steering group should
be limited to two, two-year terms and that such
terms are staggered.
Where a representative of a lay body is a
member of the Steering Group, reasonable
expenses associated with that membership
(likely to be travel costs only) may be borne
by HMI Prisons. All other Steering Group
members will be expected to bear their
own costs.
55
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents